Longyan Jinxiang Photovoltaic Technology Co., Ltd
Contact: Mr. Cao
Tel: 13823697233
thirteen billion nine hundred and six million nine hundred and seventy-three thousand six hundred and fifty
Email: 360012546@qq.com
Address: No. 11-1, Fuhang Qiaobei Road, Sheshan village, Nanyang Town, Shanghang County, Longyan City, Fujian Province
Recently, in the official account of WeChat, we learned that in February 26, 2021, the National Energy Board issued the notice on the development and construction of wind power and photovoltaic power in 2021, and gave clear development ideas for the development of wind power and photovoltaic in 2021.
Several of them deserve your attention:
1. There are still subsidies for household PV, but the subsidy intensity is not clear, and the management measures are still the same as those in 2019 and 2020.
2. In 2021, the proportion of wind power and photovoltaic power generation in the power consumption of the whole society will reach about 11% (about 9.6% in 2020)
3. There are index projects in stock, and the grid connection in 2021 can still be included in the guaranteed grid connection scale of subsequent years.
4. In combination with the Rural Revitalization Strategy, the "wind control plan for thousands of villages and townships" and the "Sunshine Action for thousands of villages and townships" were launched.
5. The provincial competent energy department shall organize the allocation of competitive schemes and shall not delegate them to local governments.
6. Priority is given to encouraging the linkage between the guaranteed grid connection scale and the amount of subsidy reduction. In principle, no less than one-third of the guaranteed grid connection scale of each province shall be directed to enterprises with insufficient subsidy to obtain the guaranteed grid connection qualification.
Letter of the comprehensive Department of the National Energy Administration on soliciting the notice on matters related to the development and construction of wind power and photovoltaic power generation in 2021 (Exposure Draft)
Energy bureaus of all provinces (autonomous regions and municipalities directly under the central government) and Xinjiang production and Construction Corps, relevant provincial (municipal) development and reform commissions, economic and information commissions (Commission of industry and information technology, Department of industry and information technology), dispatched offices, State Grid Corporation of China, China Southern Power Grid Corporation, Inner Mongolia electric power company, Power Planning Institute, Water Planning Institute, and relevant enterprises:
In order to do a good job in the development and construction of wind power and photovoltaic power generation in 2021, we have organized the preparation of the notice on matters related to the development and construction of wind power and photovoltaic power generation in 2021 (Exposure Draft). Please study and put forward opinions and suggestions, and feed back before work on March 8, 2021.
2021 is the first year of the 14th five year plan, and wind power and photovoltaic power generation have entered a new development stage. In order to continuously promote the high-quality development of wind power and photovoltaic power generation, the development and construction of wind power and photovoltaic power generation in 2021 is now discussed